Condominium · Singapore
Condominium · Singapore
Sector
Condominium
Client
Keppel Land International Ltd
Size
62,006m²
Status
Completed
Year
2014
Awards
BCA Construction Excellence Award 2016 – Merit
BCA Green Mark Award 2012 – Gold Award
The Lakefront Residences presented several significant planning and development challenges. A high plot ratio of 3.5 was coupled with a height restriction comparable to a typical residential development with a plot ratio of only 2.1. In addition, the MRT track along the northern boundary imposed an extreme setback, reducing the net buildable area to just 70 percent. The project was also required to progress from commissioning to launch within a demanding six-month timeframe.
In response to these constraints, the design evolved a new housing typology that maximises spatial efficiency while maintaining generous communal open spaces. The approach rethinks conventional notions of residential living and the use of domestic spaces, including how the kitchen can be configured to better support the needs and lifestyles of smaller households.
A highly collaborative design process was central to the project’s rapid progression. Intensive workshops involving the client and consultants were held twice weekly, enabling every design decision to be evaluated collectively and resolved efficiently. This close coordination allowed the project to move decisively through its key stages, with the major milestones achieved within the required timeframe.
Sector
Condominium
Client
Keppel Land International Ltd
Size
62,006m²
Status
Completed
Year
2014
Awards
BCA Construction Excellence Award 2016 – Merit
BCA Green Mark Award 2012 – Gold Award
The Lakefront Residences presented several significant planning and development challenges. A high plot ratio of 3.5 was coupled with a height restriction comparable to a typical residential development with a plot ratio of only 2.1. In addition, the MRT track along the northern boundary imposed an extreme setback, reducing the net buildable area to just 70 percent. The project was also required to progress from commissioning to launch within a demanding six-month timeframe.
In response to these constraints, the design evolved a new housing typology that maximises spatial efficiency while maintaining generous communal open spaces. The approach rethinks conventional notions of residential living and the use of domestic spaces, including how the kitchen can be configured to better support the needs and lifestyles of smaller households.
A highly collaborative design process was central to the project’s rapid progression. Intensive workshops involving the client and consultants were held twice weekly, enabling every design decision to be evaluated collectively and resolved efficiently. This close coordination allowed the project to move decisively through its key stages, with the major milestones achieved within the required timeframe.